Straub Construction $150,000.00
- Helped with final hardware design and generated the hardware specifications
- Supplied all HM STC 50 doors and frames
- Supplied all wood STC 43 doors
- Supplied all interior hardware, including electrical locks, panics, and hinges
- Supplied keying for the entire building